How Long Does an LSR Overmolding Project Take? From Drawing to Production

FAQS
Article Sharing

Overview: the timeline of a liquid silicone overmolding project is built from four stages: tooling development, trial validation, material purchasing and production scheduling. A standard project runs about 45-75 days from drawing approval to first delivery. This article breaks down the time in each stage, where it can be compressed, and the usual causes of delay.

Full Timeline Breakdown

For a typical LSR overmolding project, the time from drawing freeze to first delivery breaks down roughly as: tool design 5-8 days, tool machining 20-40 days, T1 trial and correction 7-15 days, sample approval and validation 5-10 days, material purchasing 7-20 days, production and inspection 5-10 days. That comes to about 45-75 days in total.

Tool machining and trial correction are the two biggest variables, together accounting for over 60% of the total timeline.

Project timeline Gantt chart for LSR overmolding

Tooling Stage

A single-cavity simple tool takes about 25-30 days; a multi-cavity precision tool 40-60 days; a complex tool with slides, lifters or a multi-material rotary table can extend past 70 days.

There is limited room to compress this stage, but resolving structural issues thoroughly in one design review avoids design changes mid-machining — the latter is the main cause of delay. Zhongshan Henry Precision Technology Co., Ltd. organizes a joint part and tooling review at project kick-off.

Trials and Correction

After the T1 trial, one to three rounds of correction are usually needed before the process stabilizes. Each round depends on the nature of the problem: parameter adjustments 3-5 days, tool modifications 7-15 days, structural changes potentially over 20 days.

The most effective way to compress this stage is to run mold flow analysis early, complete critical dimension validation at T0, and bring the supplier into the early design review.

LSR trial validation workflow

Material Purchasing Variables

Standard black or natural material is usually held in stock with a 3-7 day purchasing cycle; a special colour needs colour matching at about 10-15 days; medical-grade or imported specialty grades can take 20-45 days or longer.

If the schedule is tight, start material purchasing during tooling rather than waiting until trials pass — running the two in parallel saves 1-3 weeks.

Production and Delivery

Production time depends on order volume and capacity scheduling; a standard 5,000-50,000 piece order runs about 5-12 days. Medical orders need an extra 3-7 days because of the additional inspection items.

Zhongshan Henry Precision Technology Co., Ltd. provides a committed delivery date and progress updates on standard projects, proactively reporting at key milestones (T1 trial, sample approval, production start).

Common Causes of Delay

The top four causes of delay are: drawing changes mid-project (the most frequent), waiting because the substrate or material grade is undecided, an overly long customer sample approval cycle, and structural revisions raised after trials.

The corresponding countermeasures: freeze the drawing before kick-off, confirm the material grade early, agree a sample approval deadline (for example feedback within 5 working days), and assess structural feasibility thoroughly at the DFM stage.

Q: Can it be expedited? How fast?

A: It can be attempted. Through parallel scheduling and priority machining, a standard project can be compressed to 30-35 days at the fastest, but this incurs an expediting fee and requires drawings and materials to be fully settled before kick-off.

Q: How long does sampling take?

A: Sampling on a soft or simple tool usually takes 10-20 days, suitable for appearance and assembly validation. If you need samples close to production condition, a prototype tool is required, at about 25-35 days.

Q: Is repeat order lead time much shorter?

A: Yes. With the tool and process parameters settled, a repeat order usually needs only 7-15 days depending on quantity and scheduling, and can be shortened further once standard material is stocked.

Table of Contents

Get Your Custom Liquid Silicone Overmolding Solution in 3 Steps

Get Your Custom Liquid Silicone Overmolding Solution in 3 Steps

Learn More

We use cookies to personalize and improve your browsing experience. By clicking "Accept All", you consent to our use of cookies.
You may read our Cookie Policy for details.

A Leader in Precision LSR Overmolding

A Leader in Precision LSR Overmolding

Professional Consultation Services
We patiently answer your questions and resolve your concerns
+86 189 2812 0729 (24/7)<br>+86 136 9169 4353 (Sales - Mr. Lu) +86 189 2812 0729 (24/7)
+86 136 9169 4353 (Sales - Mr. Lu)
sales@henry-precision.com sales@henry-precision.com
*Your Name
*Your phone
Your email
Company name
*Requirements
Country / Region
*Special Requirements

We use this information solely to contact you regarding potential cooperation.
By submitting, you agree to our Privacy Policy。

Rubber Coating Requirement Assessment

Please complete the following information so that we can provide you with the evaluation result.

*Your name
*Your phone
Upload the drawings

Size should not exceed 5M and support. Doc,.Docx,.Pdf

Yuanheng guarantees that the collection of your personal information is solely for the purpose of contacting you and helping you better understand us.
By sending this message, you are agreeing to our "Privacy Policy" and "Disclaimer".