How Long Does an LSR Overmolding Project Take, and Why Is Tool Revision Expensive?
For a typical LSR overmolding project, DFM review and tooling take about 4–7 weeks, with mold trials, reliability validation and low-volume confirmation bringing the total to roughly 8–12 weeks. LSR flows extremely easily, so clearances, venting and shut-off precision must be far tighter than in a conventional plastic tool. Later revisions usually involve the cavity, shut-off faces, venting and gating — complex changes. Thorough DFM review up front is therefore the most effective way to avoid them.